Upgrading the Diving Tower

A time critical project, the upgrading of the diving tower and relocation of the spring boards provided an opportunity for Brimblecombe Builders to demonstrate their ability to deliver in a sensitive environment.

The tower was in continual use whilst the upgrade was in progress, requiring clear communication with the client.

Detailed stainless steel guard rails were installed ten metres above the pool surface in difficult conditions.

With the need to move materials in and out of the aquatic centre whilst maintaining a public thoroughfare a strong trusting relationship with the client was required. This was pivotal to the success of the project.

 

 

Brimblecombe Builders managed the project to ensure the safety of trades people and the general public was maintained at all times.

Another challenging project completed on time and within budget.


Last Modified: 19/9/2017 at 16:36
Adelaide City Council